[1]
Al Samman, D. and Wahab, R. 2012. The Requirements of Total Production Maintenance and Role of Achieving the Competitive Priorities: A Application Study on Hammam al Alil cement Factory in Mosul. TANMIYAT AL-RAFIDAIN. 34, 109 (Sep. 2012), 9–28. DOI:https://doi.org/10.33899/tanra.2012.161985.